783 Items found
Published: Wednesday 9 February 2011
Published

The objective of the audit was to assess the effectiveness of DHS' management of the tender process for a replacement BasicsCard to support the delivery of the income management scheme.

In conducting the audit, the Australian National Audit Office (ANAO) assessed the following five key areas of the replacement BasicsCard procurement process, which are described in the Department of Finance and Deregulation's (Finance) Guidance on the Mandatory Procurement Procedures :

• planning for the procurement;
• preparing to approach the market;
• approaching the market;
• evaluating tender submissions; and
• concluding the procurement, including contract negotiation.

Entity
Department of Human Services
  • When the difference between tenderers is marginal, entities need to ensure the detail of procurement decisions is accurately recorded. This is even more important when an incumbent provider is tendering for a new contract.
  • When entities identify that no tender demonstrably provides value for money, decision-making should explicitly recognise that this enlivens the Commonwealth Procurement Rules provision permitting that a contract not be entered into.
Published: Tuesday 11 September 2018
Published

The objective of the audit was to assess the effectiveness and value for money of Defence’s acquisition of light protected vehicles, under Defence project Land 121 Phase 4.

Entity
Department of Defence
Contact

Please direct enquiries through our contact page.

Published: Thursday 2 March 2006
Published

The objective of this audit was to assess DIMIA's management of the tender, evaluation and contract negotiation processes for the Detention Services Contract. Specifically, the audit considered DIMIA's processes for determining value for money based on the department's: evaluation of the request for tender, including the announcement of the preferred tenderer; negotiations with the successful and unsuccessful tenderers; and management of liability, indemnity and insurance.

Entity
Department of Immigration and Multicultural Affairs
Published: Tuesday 19 May 2009
Published

The objective of the audit was to review Defence's management of the HQJOC Project's tender process, including probity management, for the construction of the joint operation headquarters in order to provide assurance that the policy principles for the use of private financing had been followed.

Entity
Department of Defence
Published: Thursday 30 September 2010
Published

The objective of the audit was to assess how well agencies had implemented the CPGs and relevant FMA legislation when undertaking Direct Source procurement.

The audit examined whether selected agencies had developed a sound procurement framework; appropriately classified procurement methods when meeting external reporting requirements; implemented the CPGs and relevant legislation when Direct Sourcing; and established effective procurement monitoring and review arrangements.

The ANAO selected four FMA Act agencies to provide a cross-section of the 104 agencies that reported procurement activity in AusTender in
2008–09. The agencies selected for audit were:

  • the Department of Families, Housing, Community Services and Indigenous Affairs (FaHCSIA);
  • the Department of Innovation, Industry, Science and Research (Innovation);
  • the Department of Veterans' Affairs (DVA); and
  • the Australian Crime Commission (ACC).

The ANAO examined a stratified random sample of 645 procurements valued at $10 000 and over, across the four agencies. More detailed testing was undertaken for the 285 Direct Source procurements in the sample.

Entity
Across Agencies
Published: Tuesday 17 November 2009
Published

The objective of the audit was to assess the effectiveness of Defence's procurement and contract management for the provision of Garrison Support Services.

Entity
Department of Defence
Published: Tuesday 3 April 2012
Published

The audit objective was to report on the administration of the Australia Network tender process and to identify lessons learned from the conduct of the process to inform future procurement activities.

Entity
Department of Foreign Affairs and Trade, Department of Broadband, Communications and the Digital Economy and Department of the Prime Minister and Cabinet
Published: Wednesday 13 June 2007
Published

The objective of this audit was to evaluate whether selected Australian Government agencies were effectively managing security risks arising from the use of contractors. To address this objective, the audit evaluated relevant policies and practices in the audited agencies against a series of minimum requirements in the management of security issues in procurement and contracting activity. These minimum requirements were developed from the guidance and standards contained in the PSM and also from the ANAO's previous protective security audits.

The audit focused on two broad types of contracting arrangements: contracting of security functions; and contracting of any service or business function that requires, or which has the potential to require, contractors to access sensitive or security classified information.

The following Australian Government agencies were involved in this audit:

  • Australian Customs Service (Customs);
  • Commonwealth Superannuation Administration (ComSuper);
  • Department of Finance and Administration (Finance); and
  • Department of Foreign Affairs and Trade (DFAT).

In addition, the Attorney-General's Department, which is responsible for the maintenance of the PSM and for providing advice on contemporary protective security policies and practices, was consulted during the audit.

Entity
NO-DEPTS-LISTED
Published: Thursday 17 June 2010
Published

The objective of the audit was to assess whether Defence effectively managed the procurement process for services related to the recruitment of personnel to the ADF and the introduction of a new service provider.

Entity
Department of Defence
Published: Wednesday 4 February 2009
Published

The objectives of this audit were to:

  • examine whether the appointment of CMAX Communications Pty Ltd as a provider of communications support and advice for the 2020 Summit was consistent with the Commonwealth procurement framework and sound principles of public administration; and
  • assess the effectiveness of the administration of the CMAX Communications contract by PM&C.
Entity
Department of the Prime Minister and Cabinet
Published: Wednesday 31 January 2007
Published

The objective of the audit was to:

  • assess, in a selection of FMA Act and CAC Act agencies, how well the revised Commonwealth Procurement Guidelines had been implemented; and
  • identify any better practice or common problem areas to assist other agencies in their future procurement activities.

The audit focused on procurement requirements that had changed as a result of the revised CPGs, rather than being a more general audit of compliance with all procurement requirements.
The audit was conducted in the following entities:

  • Australian Federal Police;
  • Bureau of Meteorology;
  • Commonwealth Scientific and Industrial Research Organisation (CSIRO);
  • Department of Defence;
  • Department of Education, Science & Training;
  • Family Court of Australia; and
  • National Museum of Australia.
Entity
NO-DEPTS-LISTED
Published: Wednesday 6 August 2008
Published

The objective of this audit was to assess the effectiveness of Tourism Australia's governance arrangements, the management of its marketing contracts, and whether outcomes are being achieved. The audit reviewed Tourism Australia's:

  • procurement processes for selecting service providers;
  • management of service provider contracts; and
  • governance framework including planning, performance management and reporting.
Entity
Tourism Australia
Published: Tuesday 23 June 2009
Published

The objective of the audit, in examining the construction of the CIIDC, was to assess:

  • the adequacy of the planning and delivery processes for the project;
  • the value-for-money achieved in the delivery of the project, including with regard to the suitability of the centre for its intended purpose; and
  • the extent to which the Public Works Committee Act.
Entity
Department of Finance and Deregulation
Published: Thursday 5 March 2009
Published

The objective of the audit was to assess the effectiveness of the procurement and contracting associated with:

  • the design, development and delivery of government advertising campaigns by Commonwealth departments; and
  • the operation of the Central Advertising System (CAS).
Entity
Department of the Prime Minister and Cabinet; Department of Finance and Deregulation; Department of Education, Employment and Workplace Relations; Department of Health and Ageing; Attorney-General's Department
Published: Thursday 26 June 2014
Published

The audit objective was to assess the effectiveness of the Department of Health’s management of the National Medical Stockpile.

Entity
Department of Health
Contact

Please direct enquiries relating to reports through our contact page.

Published: Wednesday 30 June 2004
Published

The objective of this audit was to provide an independent assurance on the effectiveness of Defence's management of the acqusition of armoured infantry mobility vehicles (IMV) for the Australian Defence Force (ADF). The audit sought to identify the initial capability requirements; analyse the tendering and evaluation process; and examine the management of the project by Defence. As such, this was not an audit of contractor performance, but of the formation and contract management of the aquisition project by Defence.

Entity
Department of Defence
Published: Thursday 14 April 2005
Published

The objectives of the audit were to determine whether FaCS and Centrelink had: a valid Business Case for the Edge project, as revised from time to time, including estimated costs, actual costs, and expected benefits; effective governance of the project, including reviews at critical points in the project and subsequent decisions to continue or, in the final analysis, to discontinue; an appropriate contract with SoftLaw, which was adequately managed; delivered appropriate advice on progress, project viability, and acceptable solutions to technical issues to Executive of FaCS and Centrelink during the project; and valid reasons for discontinuing the project. The ANAO began this audit in March 2004, four months after the Edge project was terminated, following the Auditor-General's agreement to a suggestion by the Joint Committee of Public Accounts and Audit that the project was a suitable subject for audit.

Entity
Department of Family and Community Services; Centrelink
Published: Tuesday 1 May 2007
Published

The objective of the audit was to assess the effectiveness of the management by Defence and the DMO of the procurement of the modernised High Frequency communication capability for the ADF. The audit focussed on Phase 3A of the Project which commenced in the mid 1990's and involved the selection of the Prime Contractor; negotiation of the Prime Contract and the Network Operation and Support Contract; and the development and implementation of the Communication System.

Entity
Defence Materiel Organisation
Published: Thursday 15 August 2013
Published

The objective of the audit was to assess the adequacy of Defence’s processes, including compliance with the Financial Management and Accountability Act 1997 (FMA Act), the Financial Management and Accountability Regulations 1997 (FMA Regulations), and relevant Commonwealth and Defence procurement requirements, to select the capability solution recommended to the Government to satisfy the requirements of AIR 8000 Phase 2.

Entity
Department of Defence
Contact

Please direct enquiries relating to reports through our contact page.

Published: Tuesday 15 February 2005
Published

The overal objective of the Australian National Audit Office (ANAO) audit was to determine the efficiency and effectiveness of the conversion to digital broadcasting by the national broadcasters. This encompasses, among other things, addressing the request from the former Minister for Communications, Information Technology and the Arts (the Minister) for an audit of the actual cost of digital conversion, the sources of funds applied and the efficiency of funds utilisation. It also involved an examination of the broadcasters' management processes to deliver their Strategies and to 'minimise the call on the Budget'.

Entity
Australian Broadcasting Agency and Special Broadcasting Service Corporation
Published: Thursday 28 June 2012
Published

The objective of the audit was to assess the effectiveness of the Department of Broadband, Communications and the Digital Economy’s administration of the Household Assistance Scheme.

Entity
Department of Broadband, Communications and the Digital Economy, Department of Human Services
Published: Tuesday 24 June 2008
Published

The objectives for the audit of the third tranche sale of Telstra shares were to:

  • assess the extent to which the Government's sale objectives were achieved, including maximising overall value for money;
  • assess the effectiveness of the management of the sale; and
  • identify principles of sound administrative practice to facilitate potential improvements in any future asset sales.
Entity
Department of Finance and Deregulation
Published: Tuesday 28 June 2005
Published

The objective of the audit was to assess whether purchases of goods and services are conducted in accordance with relevant legislation, Government policies and guidelines, and sound purchasing principles and practices. The audit at each entity covered the internal control framework for purchasing and purchase transactions during 2002-03 and 2003-04 and, where applicable, was based on the CPGs current at that time. The audit examined all aspects of the purchasing process from the initial requirement for purchase through to the delivery of the supply and payment. It included an examination of aselection of individual purchases at each audited entity.

Entity
Australian National University; Australian Research Council; CRS Australia; The Department of Finance and Administration
Published: Wednesday 2 May 2007
Published

The audit objective was to assess whether the early stages of DIAC's preparations for the re-tendering of the detention and health services contracts were consistent with sound practice. The audit focused on governance arrangements, in particular the recordkeeping arrangements, roles and responsibilities of personnel, expert advisors and the probity auditor—matters raised in the previous audit report. The audit did not examine the RFT, which is not due to be issued until April 2007.

Entity
NO-DEPTS-LISTED
Published: Tuesday 27 June 2006
Published

The objective of the audit was to assess the framework being put in place to manage and account for aid funds provided under the AIPRD. In particular, the audit addressed: structures for oversighting the development and delivery of the AIPRD; planning and risk management (including those relating to fraud and corruption); financial management; and arrangements for ongoing monitoring and reporting. The audit focussed on the arrangements being established to monitor, evaluate and report on AIPRD implementation, rather than the management of activities and outcomes achieved. This reflects the fact that the long lead times associated with establishing such a large programme of assistance had meant that only limited activities were underway at the time of audit fieldwork. The ANAO anticipates undertaking an audit in the future of the management of activities and outcomes achieved, when more funds have been expended. It was not the purpose of this audit to examine Australia's immediate emergency and humanitarian response to the tsunami crisis.

Entity
Australian Agency for International Development; Department of Foreign Affairs and Trade
Published: Tuesday 2 May 2006
Published

The objective of the audit was to assess the effectiveness of management of the procurement of a major, new capability for the ADF by the DMO and Defence. The audit reviewed the initial capability requirements and approval process; analysed the contract negotiation process; and examined management of the Acquisition and Through-Life-Support Contracts. Coverage of the audit extended from development of the concept for the requirement, to acceptance of deliverables in the period prior to the award of the Australian Military Type Certificate (see shaded area of Figure 1). The audit fieldwork was undertaken during the delivery phase of the Project, following delivery of ARH numbers 1, 2 and 5.

Entity
Department of Defence; Defence Material Organisation
Published: Monday 28 September 2009
Published

The Senate Order for Departmental and Agency Contracts (the Senate Order/the Order) was introduced in June 2001. The Order is one of several measures that the Senate introduced in recent years, to improve public knowledge of information on procurement and the expenditure of public funds. The main principle that underpins the Senate Order is that the Parliament's and public's access to this information should not be restricted by the inclusion of confidential information in contracts unless there is a sound basis for doing so. Public knowledge of information on contracted goods and services delivered to the government, can lead to better results for the Australian Government and the public. The Senate Order requirements have been amended over time to improve agency reporting, for example, on grants.

Entity
Across Agencies
Published: Wednesday 22 September 2010
Published

The audit objective was to assess the appropriateness of the use and reporting of confidentiality provisions in Australian Government contracts. This included assessing compliance with the Order and following up on the implementation of recommendations made in previous Senate Order audits.

The audit involved three components:

  • an examination of a stratified random sample of 150 contracts listed as containing confidentiality provisions from material and small agencies across the Australian Government to determine whether confidentiality provisions were used and reported appropriately;
  • an examination of all FMA Act agencies' calendar year 2009 contract listings, and ministers' letters of advice, to assess compliance with the requirements of the Order, and check reported instances of excluded contracts; and
  • a follow-up of the implementation of previous audit recommendations relating to the administration of the Senate Order in four agencies. The selected agencies were the: Australian Agency for International Development (AusAID); Department of Families, Housing, Community Services and Indigenous Affairs (FaHCSIA); Department of Agriculture, Fisheries and Forestry (DAFF); and the Federal Court of Australia (Federal Court). The selected agencies were audited in one of the ANAO's previous five audits of Senate Order compliance.
Entity
NO-DEPTS-LISTED
Published: Thursday 30 August 2012
Published

To assess the effectiveness of the Department of Broadband, Communications and the Digital Economy’s (DBCDE’s) administration of the Regional Backbone Blackspots Program (RBBP), involving the establishment and ongoing management of the program.

Entity
Department of Broadband and Communications and the Digital Economy
Published: Tuesday 1 May 2012
Published

The objective of the audit was to assess the extent to which FMA Act agencies’ establishment and use of procurement panels supported value for money, efficiency and effectiveness in procurement. The objective of the audit was to assess the extent to which FMA Act agencies’ establishment and use of procurement panels supported value for money, efficiency and effectiveness in procurement.

Entity
Australian Securities and Investments Commission, Department of Broadband, Communications and the Digital Economy and the Department of Foreign Affairs and Trade
Published: Wednesday 17 June 2009
Published

Given the significant expenditure associated with the Super Seasprites, and the problems that the Project had encountered over some time, the ANAO had commenced this performance audit prior to the Government's decision to cancel the Project. The focus of the audit was on Defence's and DMO's administration of the Project. In light of the Government's decision to cancel the Project, the objective of the audit was revised to place greater emphasis on those issues that resulted in the failure of the Project to provide the required capability, and highlighting project management lessons for major Defence acquisitions going forward.Accordingly the audit objective was to:

  • identify those factors that contributed to the on-going poor performance of the Project;
  • outline measures taken by Defence and DMO in seeking to overcome issues encountered by the Project, and key lessons arising from this project for the benefit of major acquisitions projects generally; and
  • determine the capability and cost implications of a project that failed to deliver to expectations.
Entity
Department of Defence
Published: Friday 25 February 2005
Published

The objective of the audit was to provide an independent assurance of the effectiveness of Defence's management of the acquisition, and future provision of the Armidale Class Patrol Boats capability, relating to the in-service support contract, provision of infrastructure, and crewing sustainability.

Entity
Department of Defence
Published: Wednesday 25 February 2009
Published

The audit focussed on performance information reporting by the submarine System Program Offices on reliability, safety systems and logistic support services. In the context of the sustainability arrangements, the audit considered combat system upgrades and personnel escape and rescue systems. Any arrangements that the Commonwealth may be considering regarding the potential sale of ASC were not within the scope of this audit.

Entity
Department of Defence
Published: Tuesday 17 July 2007
Published

The objective of the audit was to assess the effectiveness of management of the procurement of a major, replacement capability for the Australian Defence Force (ADF) by the DMO, and Defence. The audit reviewed the initial capability requirements and approval process; analysed the acquisition agreements for elements of the project; and examined the interim through-life support arrangements being put in place to support the capability.

Entity
Department of Defence; Defence Materiel Organisation
Published: Wednesday 8 February 2012
Published

The audit objectives were:

  • to assess the effectiveness of the revised certification process in promoting compliance of government advertising campaigns (campaigns) with the March 2010 Guidelines on Information and Advertising Campaigns by Australian Government Departments and Agencies (2010 Guidelines);
  • to assess the effectiveness of agency administration in developing campaigns and implementing key processes against the requirements of the campaign advertising framework;
  • to assess the effectiveness of Finance’s administration of the campaign advertising framework; and
  • to assess the effect on campaigns of an exemption from the 2010 Guidelines.
Entity
Across Agencies
Published: Thursday 20 September 2012
Published

The objective of the audit was to assess the appropriateness of the use and reporting of confidentiality provisions in Australian Government contracts for 2011.

Entity
Across Agencies
Published: Monday 25 June 2007
Published

The objective of the audit was to assess the management practices undertaken by APS agencies to achieve value for money and transparency in dealing with contracts for non-APS workers. The focus of the audit was on circumstances where agencies had a significant reliance on a non-APS workforce to assist in achieving their core functions. Regular reporting by agencies of expenditure on non-APS workers was outside the scope of this audit.

Entity
NO-DEPTS-LISTED
Published: Thursday 5 February 2009
Published

The second audit, which is the subject of this report, is a broader and more in-depth cross-portfolio audit. Its objective was to assess:

  • the planning and delivery of capital works projects by proponent agencies;
  • the extent to which projects have delivered on what was intended; and
  • the extent to which proponent agencies have complied with the requirements of the Public Works Committee Act 1969 and approved procedures.
Entity
Across Agencies
Published: Wednesday 25 June 2014
Published

The audit objective was to assess the Department of Defence’s progress in delivering Multi-Role Helicopters (MRH90 aircraft) to the ADF through AIR 9000 Phases 2, 4 and 6, within approved cost, schedule and performance parameters.

Entity
Department of Defence; Defence Materiel Organisation
Contact

Please direct enquiries relating to reports through our contact page.

Published: Thursday 26 October 2006
Published

The objective of the audit was to provide an independent assurance on the effectiveness of Defence and DMO's management of the acquisition of the ASLAV capability to Army. The audit examined the initial capability requirements and approval process, the contract negotiation process, and the management of the Project and Contracts by DMO.

Entity
Department of Defence; Defence Materiel Organisation
Published: Thursday 26 September 2013
Published

The audit objective was to assess the appropriateness of the use and reporting of confidentiality provisions in Australian Government contracts for the 2012 calendar year reporting period.

Entity
Attorney-General's Department; Australian Transaction Reports and Analysis Centre; ComSuper; Department of Health and Ageing
Contact

Please direct enquiries relating to reports through our contact page.

Published: Tuesday 26 February 2013
Published

The objective of this audit was to assess the effectiveness of the Australian Government Reconstruction Inspectorate, supported by the National Disaster Recovery Taskforce, in providing assurance that value for money is being achieved in recovery and reconstruction expenditure in Victoria.

Entity
Department of Regional Australia, Local Government, Arts and Sport
Published: Monday 24 June 2013
Published

The objective of the audit was to assess the effectiveness of the Australian Taxation Office’s management of its property portfolio.

Entity
Australian Taxation Office
Contact

Please direct enquiries relating to reports through our contact page.

Published: Thursday 29 September 2005
Published

The objectives of the audit were to assess agency performance in relation to compiling their Internet listings as required by the Senate Order and the appropriateness of the use of confidentiality provisions in Commonwealth contracts. The audit involved a detailed examination in seven agencies of the processes used to compile their Internet listings and the use of confidentiality provisions in contracts.

Entity
Across Entities
Published: Tuesday 15 March 2016
Published

The audit objective is to assess the effectiveness of the Department of Defence's management of the Mulwala Redevelopment Project.

Entity
Department of Defence
Contact

Please direct enquiries relating to reports through our contact page.

Published: Friday 23 September 2005
Published

The audit objective was to examine the adequacy of Defence's and DMO's management of the nearly completed elements of Project Air 5276. The ANAO identified a number of causes for time delays and cost escalation in those elements. Those causes are outlined in the overall audit conclusions, to assist in the achievement of improvements in future planning and management of capital equipment acquisitions.

Entity
Department of Defence
Published: Thursday 28 September 2006
Published

The objectives of the audit were to assess agency performance in relation to compiling their Internet contract listings as required by the Senate Order and the appropriateness of the use of confidentiality provisions in Commonwealth contracts. The audit involved a review in seven agencies of the processes used to compile their Internet contract listings and the use of confidentiality provisions in contracts.

Entity
Across Entities
Published: Wednesday 25 February 2004
Published

This report relates to the fifth audit of Financial Management and Accountability Act 1997 (FMA Act) agencies' compliance with the Senate Order for Departmental and Agency Contracts, (the Senate Order) to list, on the Internet, contract details for the Financial Year 2002-2003 reporting period. The audit was conducted in accordance with the Senate Order request for the Auditor - General to undertake twice - yearly examinations of agency contracts listed on the Internet, and to report whether there had been any inappropriate use of confidentiality provisions. The objectives of the audit were to assess agency performance in relation to compiling the Internet listings required by the Senate Order and the appropriateness of the use of confidentiality of provisions in Commonwealth contracts.

Entity
Australian Industrial Registry; Australian Taxation Office; Department of Communications Information Technology and the Arts; Department of the Environment and Heritage; Federal Court of Australia; National Office for the Information Economy
Published: Tuesday 11 September 2007
Published

The objective of this audit was to examine Australia's preparedness to respond to a human influenza pandemic and an outbreak of avian influenza in domestic poultry. The audit assessed:

  • the whole of government arrangements for an influenza pandemic;
  • action taken by DAFF to implement the recommendations from Exercise Eleusis, which tested the response arrangements for avian influenza;
  • DoHA's planning for, and execution of, Exercise Cumpston, which tested the preparedness and response to an influenza pandemic; and
  • the establishment, management and deployment arrangements of the National Medical Stockpile.
Entity
Department of Health and Ageing; Department of Agriculture, Fisheries and Forestry
Published: Thursday 28 July 2005
Published

The objective of the audit was to provide an independent assurance on the effectiveness of the management of the upgrade of the M113 fleet for the Australian Defence Force (ADF). The audit sought to identify the initial capability requirements and approval process; analyse the contract negotiation process; and examine the management of the project and contracts.

Entity
Department of Defence
Published: Thursday 22 December 2005
Published

The objective of the audit was to assess and report on the progress being made by agencies subject to the Financial Management & Accountability Act 1997 and entities subject to the Commonwealth Authorities & Companies Act 1997: in realising value for money from the procurement process, with a specific focus on buildings, services and products using whole of life cycle assessments; and in the consideration and management of environmental impacts in specifications and contracts. The emphasis of the audit was on green office procurement and sustainable business practices and the value for money within this context. As such, the audit report provides a status report on the implementation of ESD within the office environment of the Australian Government. The audit used a survey approach in conjunction with selected audit investigations to obtain information across 71 agencies and entities selected on the basis of materiality in procurement and coverage across large, medium and small organisations. The agencies selected represented approximately 35 per cent of all government bodies and over 95 per cent of all procurement spending noted on the Department of Finance and Administration (Finance) database on contracts.

Entity
across agency
Published: Thursday 20 May 2010
Published

The objective of this audit was to review the effectiveness of Defence's and the DMO's management of the acquisition arrangements for JP 2070.

Entity
Department of Defence
Published: Thursday 24 March 2011
Published

The Objective of the audit was to assess the administrative effectiveness of GPET's management of the general practice training programs, AGPT and PGPPP, the latter being a responsibility that GPET assumed in 2010.

Entity
General Practice Education and Training Limited
Published: Wednesday 17 May 2006
Published

The objective of the audit was to examine processes used by Defence and the DMO to procure explosive ordnance for the ADF, with an emphasis on Army requirements. The audit reviewed the extent to which the DMO effectively translated the explosive ordnance requirements of the ADF, and particularly of Army, into procurement and through life support arrangements.

Entity
Department of Defence; Defence Materiel Organisation
Published: Thursday 23 April 2009
Published

The objective of this performance audit of construction projects on the AusLink National Network was to assess the effectiveness of the administration by DITRDLG in working with the States to deliver the outcomes expected by the Government and the broader community. To inform the audit assessment, the methodology included examination of both Australian Government and State Government records as well as site inspections in relation to 21 projects being delivered in three States (New South Wales (NSW), Queensland and Tasmania). DITRDLG and the respective State road transport authorities were consulted in the selection of projects to be examined in detail.

Entity
Department of Infrastructure, Transport, Regional Development and Local Government
Published: Thursday 28 February 2013
Published

The objective of the current audit was to assess the effectiveness of remediation arrangements put in place by Defence and the Defence Materiel Organisation (DMO) to resolve issues impacting on the achievement of the desired lightweight torpedo capability. It focuses on project management and contractual arrangements, and the progress made with platform integration and test and evaluation.

Entity
Department of Defence; Defence Materiel Organisation (DMO)
Published: Tuesday 17 May 2011
Published

The objective of the audit was to examine the effectiveness of the management of maintenance of the Defence estate, taking particular account of planning and delivery aspects.

The audit examined: Defence’s policies, procedures, processes and supporting tools related to the planning and delivery of the maintenance of the estate; and services provided to Defence by private sector firms in relation to maintenance activities. The audit did not focus on contract management matters, nor on the systems used by Defence to maintain information related to estate maintenance.

Entity
Department of Defence
Published: Thursday 30 May 2013
Published

The objective of the audit was to assess the effectiveness of the Department of Human Services' arrangements for engaging and managing External Collection Agencies to recover debts arising from Centrelink payments.

Entity
Department of Human Services
Contact

Please direct enquiries relating to reports through our contact page.